PROJECT DESCRIPTION: These are special fire-resistant substation structures designed to be used in the TURKSTREAM project located in Kiyikoy.
SERVICES: ⦁ Static design and preparation of calculation report. ⦁ 3D structural steel design and preparation of manufacturing drawings. ⦁ Design of equipment and HVAC duct connections. ⦁ Coating, closure and architectural detail solution, quantity work. ⦁ Solution of container lifting details, rope selection and determination of lifting angle.